A water-based fire fighting system is the part of a building that has to work first time, after years of standing still. It brings together a dedicated water store, fire pumps, a network of mains and risers, and the outlets that put water on a fire: automatic sprinklers, internal hose reels, landing valves for the fire brigade and external hydrants.

Trident Plumbers Limited installs fire fighting systems alongside plumbing and drainage, and our commercial projects include hospitals, schools, office blocks, shopping malls, an airport terminal and an industrial plant. We take a system from the fire engineer’s design or our own layout through installation, pressure testing and commissioning, and then keep it inspected and maintained.

At a glance

  • Installation of fire suppression systems, including sprinklers and fire hydrants.
  • Design and setup of fire protection systems to enhance safety in commercial buildings.
  • Regular maintenance and inspections to ensure the system’s reliability.
Red fire fighting pump room pipework and valves

What we deliver

From design to maintenance, one contractor

Trident can take on the whole package or the part you need, working to your consultant’s design or to our own.

  1. 01Design & sizing

    Hazard classification, sprinkler and hose-reel layouts, hydraulic calculations, pump duty and water-storage sizing, coordinated with the architect, structure and other services.

  2. 02Supply

    Listed sprinkler heads, valves, alarm valve sets, pipes and fittings, fire pump sets and controls sourced to the project specification, with data sheets for approval.

  3. 03Installation

    Pump rooms, fire mains, risers, sprinkler ranges, hose reels, landing valves and hydrants installed by our own crews, properly supported, labelled and coordinated on site.

  4. 04Testing & commissioning

    Hydrostatic pressure tests, flushing, flow and pressure tests at the most remote outlets, pump performance and automatic start checks, witnessed and recorded for handover.

  5. 05Maintenance

    Scheduled inspections, pump run tests, valve exercising and repairs so the system stays ready, with records the building owner can show to the fire authority and insurers.

Systems and components we install

  • Automatic sprinkler systems (wet pipe) with alarm valve sets and flow switches
  • Fire pump sets: duty electric, diesel standby and jockey pumps with controllers
  • Fire water storage tanks and suction arrangements
  • Internal hose reels and dry or wet risers with landing valves
  • External fire hydrants, ring mains and fire brigade inlets
  • Isolation, test and drain valves with monitoring

Typical buildings

  • Hospitals and clinics
  • Schools and universities
  • Offices and banks
  • Shopping malls
  • Hotels and apartments
  • Factories and warehouses
  • Airports and public buildings

Standards and good practice

We install to the project specification and to the codes it calls up. On fire fighting work these commonly include:

NFPA 13
Installation of sprinkler systems
NFPA 14
Standpipe and hose systems
NFPA 20
Stationary fire pumps
BS EN 12845
Automatic sprinkler systems: design, installation and maintenance
Kenya OSHA 2007
Factories and Other Places of Work (Fire Risk Reduction) Rules, 2007
Local approvals
County fire department requirements and the consultant’s fire strategy

The governing code is set by the project’s fire engineer and local authority; we follow it and provide the test records needed for approval.

How we work

A clear process, start to finish

  1. Brief and site visit

    We review your drawings, specification or bill of quantities and, where needed, visit the site to understand the building and how it will be used.

  2. Design and proposal

    We size the system, select equipment to the specification and give you a clear, itemised quotation.

  3. Approvals and procurement

    Shop drawings and material submittals go to the consultant for approval before materials are ordered.

  4. Installation

    Our own crews install the works, coordinated with the main contractor and the other trades on site.

  5. Testing and commissioning

    Every system is tested and commissioned, with results recorded and witnessed by the client or consultant.

  6. Handover and aftercare

    As-built drawings, operation and maintenance information and training for your team, followed by maintenance when you need it.

Why clients choose Trident

Plumbing and mechanical installations have been our business since 1988. Our engineers, supervisors and skilled crews work across Kenya, Rwanda and Uganda on buildings of every size.

About the company
  • Since 1988Established in Nairobi, incorporated in 1993
  • NCA Category 1Registered with the National Construction Authority
  • ISO 9001:2015Certified quality management system
  • 3 countriesCompanies in Kenya, Rwanda and Uganda

FAQ

Fire Fighting Services: common questions

Both. We can install to a consultant’s design, or prepare layouts and hydraulic calculations for approval by the project’s fire engineer and the local authority.